Development & Manufacturing

Connect the product solution, electronics, software and mechanical design with prototype evaluation and manufacturing.

ENGINEERING PHOTOGRAPHS

Inside the prototype debugging process.

Workbench photographs supplied by Nuopuen show the prototype, probe and measurement equipment together.

An open prototype enclosure and connected probe beside an oscilloscope displaying a waveform.
01 / Prototype waveform observationAn open prototype enclosure and connected probe beside an oscilloscope displaying a waveform.
A therapy probe positioned in an ultrasound power meter, with prototype controls and an oscilloscope alongside.
02 / Probe and prototype bench setupA therapy probe positioned in an ultrasound power meter, with prototype controls and an oscilloscope alongside.

Select an image to view the original photograph.

Explore the board assemblies ↗

ENGINEERING TO PRODUCTION

One coordinated scope across development and manufacturing.

Nuopuen’s project work can cover the complete product solution, hardware development, embedded software, communication protocols, industrial and structural design, prototypes, testing, PCBA production and finished-device manufacturing.

Scope, acceptance criteria and responsibilities should be agreed before work starts. A full-device project and a board-only project use different deliverable lists.

A proposed workflow for your project.

StageWork and discussionReview point
01 RequirementsClarify application, output functions, interfaces, target market and expected quantity.Agreed requirements and open questions.
02 Product solutionDefine architecture, hardware and software scope, structural needs and commercial terms.Confirmed scope and project deliverables.
03 DevelopmentCarry out the agreed hardware, embedded software, protocol and mechanical work.Design review against the requirements.
04 Prototype and testPrepare and evaluate the prototype; resolve changes and testing needs.Accepted prototype and documented revisions.
05 Production preparationConfirm the released configuration, technical materials and manufacturing requirements.Production configuration and acceptance conditions.
06 Manufacturing and handoverProduce PCBAs and finished devices within the agreed scope and deliver the defined technical materials.Agreed product and documentation handover.

Testing support tied to a real project.

For a Hong Kong client’s single-probe, 1 MHz and 3 MHz ultrasound therapy device, Nuopuen supported independent third-party testing associated with the client’s FDA-related requirements. The client subsequently brought the product to market.

Testing support for a new project is scoped to its intended use, target market and agreed responsibilities. Applicable reports and deliverables are identified for the particular product.

See the project scope and outcome ↗

Confirm these points at the start.

01

Ownership & documentation

Identify the technical materials, usage rights, source-code terms and release milestones in the agreement.

02

Changes & acceptance

Agree how requirements, design revisions and prototype acceptance will be recorded and approved.

03

Cost & timing

Separate development, prototypes, tooling and production quantities. Confirm the schedule against the actual scope.

TEST DOCUMENTATION

A closer look at a test record.

User-supplied radiated emission measurement excerpt dated December 2, 2024, showing a scan plot and six measurement rows
Radiated emission measurement excerpt supplied by Nuopuen. Third-party company details have been redacted. Select the image to inspect the redacted record.

Radiated emission measurement

The supplied excerpt shows a frequency scan and a table of six measurement points. The details below are transcribed from the visible record.

Record date
2 December 2024
Standard shown
EN55011 RE-Class A
Polarization
Vertical
Measurement distance
3 m

This excerpt documents one radiated-emission measurement record. It is not a complete EMC report or an FDA approval document. The EUT and Mode fields are blank in the supplied image, so it is not assigned here to a specific device model or to the Hong Kong case.

View redacted test record ↗